EdocGram
Home
(current)
Topics
EdocAI
Code Editor
HTML
Javascript
PHP
Python
Python AI Code Editor
More
Contact
About
Privacy Policy
Terms and Conditions
Log In
Topic: Greedy Algorithm Problem / Level: advanced
Problem:
Design a Greedy algorithm to allocate public funds for urban development where each project has varying costs and public benefits. Maximize total public benefit while minimizing project delays.
More Problems
You are given a set of traffic signals in a city where each signal has different traffic patterns and durations. Implement a Greedy algorithm to minimize traffic congestion while maximizing traffic flow.
Design a Greedy algorithm to allocate limited bandwidth in a wireless network where each user has varying data needs and priority levels. Maximize total data usage while minimizing network congestion.
You are tasked with scheduling power plant shutdowns for maintenance where each plant has varying power outputs and repair times. Maximize total power production while minimizing downtime.
Design a Greedy algorithm to allocate funding to startup companies where each startup has varying growth potential and funding needs. Maximize total return on investment (ROI) while minimizing the number of unfunded startups.
You are given a set of space missions where each mission has varying costs, timelines, and scientific potential. Implement a Greedy algorithm to maximize the number of missions completed while minimizing total costs.
Design a Greedy algorithm to allocate limited resources to a network of solar panels where each panel has varying energy output and installation costs. Maximize total energy production while minimizing installation costs.
You are tasked with scheduling flight takeoffs and landings in a busy airport where each flight has varying takeoff times, durations, and priority levels. Maximize the number of flights scheduled while minimizing delays.
Design a Greedy algorithm to allocate limited bandwidth across multiple online video platforms where each platform has varying viewer engagement and data usage. Maximize viewer satisfaction while minimizing bandwidth congestion.
Python
Language
Editor
Run & Output
Save
AI Code Generate
AI Test Case
Run the code to see the output here...