EdocGram
Home
(current)
Topics
EdocAI
Code Editor
HTML
Javascript
PHP
Python
Python AI Code Editor
More
Contact
About
Privacy Policy
Terms and Conditions
Log In
Topic: Greedy Algorithm Problem / Level: advanced
Problem:
Design a Greedy algorithm to allocate limited public funds to urban development projects where each project has varying public benefits, costs, and completion times. Maximize the total public benefit while minimizing project delays.
More Problems
You are tasked with scheduling the release of critical software updates in a company where each update has different risks, development times, and user importance. Maximize system stability while minimizing delays.
Design a Greedy algorithm to allocate limited advertising slots on popular video platforms where each ad has different engagement levels and potential revenue. Maximize total revenue while minimizing user dissatisfaction.
You are given a set of tasks in a shared computing environment where each task has different memory and processing requirements. Implement a Greedy algorithm to maximize the number of tasks completed while minimizing resource overuse.
Design a Greedy algorithm to allocate water resources during a drought where each affected region has different population sizes, water needs, and infrastructure. Maximize total water distribution while minimizing shortages.
You are tasked with scheduling the deployment of a limited number of rescue teams in a disaster-stricken country where each region has varying levels of need and logistical constraints. Maximize the number of people helped while minimizing resource wastage.
Design a Greedy algorithm to allocate limited medical supplies in a hospital where each department has varying patient loads, supply needs, and urgency levels. Maximize patient treatment while minimizing supply shortages.
You are given a set of projects in a tech company where each project has different development timelines, resource requirements, and potential profits. Implement a Greedy algorithm to maximize total project success while minimizing delays.
Design a Greedy algorithm to allocate limited bandwidth across multiple telecommunications networks where each network has varying user demands, data traffic, and revenue potential. Maximize total network efficiency while minimizing bandwidth congestion.
Python
Language
Editor
Run & Output
Save
AI Code Generate
AI Test Case
Run the code to see the output here...