EdocGram
Home
(current)
Topics
EdocAI
Code Editor
HTML
Javascript
PHP
Python
Python AI Code Editor
More
Contact
About
Privacy Policy
Terms and Conditions
Log In
Topic: Greedy Algorithm Problem / Level: advanced
Problem:
Design a Greedy algorithm to allocate limited public funds to urban development projects where each project has varying costs, public benefits, and completion times. Maximize the total public benefit while minimizing project delays.
More Problems
You are tasked with scheduling the release of autonomous vehicles in a city where each vehicle has different routes, capacities, and operational costs. Maximize total passenger service while minimizing operational expenses.
Design a Greedy algorithm to allocate limited bandwidth across multiple streaming services where each service has varying viewer engagement and data usage. Maximize total viewer satisfaction while minimizing bandwidth congestion.
You are given a set of scientific experiments where each experiment has varying resource needs, timelines, and potential breakthroughs. Implement a Greedy algorithm to maximize the number of experiments conducted while minimizing delays.
Design a Greedy algorithm to allocate limited medical supplies in a hospital during an emergency where each department has different patient loads and supply needs. Maximize patient care while minimizing supply shortages.
You are tasked with scheduling the repair of critical infrastructure in a national railway system where each repair has varying traffic volumes, repair costs, and public benefits. Maximize the number of repairs completed while minimizing train delays.
Design a Greedy algorithm to allocate limited research funding to university research departments where each department has varying success probabilities, project timelines, and potential discoveries. Maximize total research output while minimizing financial risk.
You are given a set of jobs in a distributed computing environment where each job has different processing requirements, execution times, and memory needs. Implement a Greedy algorithm to maximize total job completion while minimizing server overload.
Design a Greedy algorithm to allocate limited advertising slots on popular digital platforms where each ad has varying viewer engagement and potential revenue. Maximize total revenue while minimizing user dissatisfaction.
Python
Language
Editor
Run & Output
Save
AI Code Generate
AI Test Case
Run the code to see the output here...